Trains to be Regulated Temporarily

As part of Kochi Metro Rail civil works in the Aluva-Ernakulam route, Southern Railway will change the time schedule of trains on October 20, 24, 27, 31 and November 3. On these days, train No. 56389 Ernakulam-Kottayam Passenger( 8.30 pm) and train No. 56376 Ernakulam-Guruvayoor passenger( 7.40 pm) have been cancelled. Train No. 16306 Kannur-Ernakulam Intercity Express […]

A VOICE OF VERITY FROM KOCHI METRO RAIL

  It’s nothing unusual to have facing many issues when aiming for a higher dream, that too when it’s the dream of thousands, the dream of an entire city. Kochi Metro Rail has been working towards this higher goal ever since this dream was born in the minds of few great minds. Ever since, KMRL […]

Stick No Bills !!!

The civil structures of the Kochi Metro Rail project such as piers, columns, viaduct and the station building are coming up in the city of Kochi.  The Kochi Metro Rail system is a matter of pride for all the citizens of Kochi, and we have to instill a tradition that the metro structures will be […]

Stay Away from Fake Job Traps

  Kochi Metro Rail Limited is in the process of augmenting the organization for undertaking the actual operations and maintenance of the Kochi Metro Rail system.   For this purpose, we require a variety of specialists like Section Engineers, Junior Engineers, Train Operators/Station Controllers and Maintainers for the present.  The details regarding the positions presently required are […]

Inauguration of widening and improvements of Vyttila- Petta road

                                    Shri. Aryadan Mohammed, Minister for Power, will inaugurate the widening and the improvements of the Vyttila- Petta road from Kunnara Park to Petta on 2nd October 2015 at a function held near Thykkoodam KSEB sub station. The function […]

© 2017 Kochi Metro Blog All rights reserved. | Powered by WordPress
Theme created by @julienrenaux